PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing conduit for temporary power Facing South-West (800x600).jpg Installing layout for the wall forms along column line 6.5 (G-C.7) Facing South-West (800x600).jpg Installing rebar along foundation wall and footings at column line 6.5 (G-C.7) Facing South-East (800x600).jpg Metal Decking at Derrick -3 3rd Floor Facing South-East (800x600).jpg Starting working on removing the lines at Cherry St Facing Noth (800x600).jpg Verizon Removing the lines at Cherry St (800x600).jpg Verizon truck at Cherry St (800x600).jpg Verizon Working on removing the light poles Facing East (800x600).jpg Cutting beam pockets at Stair -4 3rd floor Facing South-East (800x600).jpg
Previous pageNext page Starting working on removing the lines at Cherry St Facing Noth (800x600)
Starting working on removing the lines at Cherry St Facing Noth (800x600)